The Palais approach

One system, engineered and tested as a whole.

Engineer it once, build and test it in a factory, and deliver it ready to connect. That shortens schedules, reduces work on site and makes the next phase a repeat of the last one.

L1

Power

UPS, switchgear and batteries, integrated and tested

L2

White space

Racks, containment, busway and cable trays

L3

Liquid loop

CDUs, manifolds, cold plates and prefabricated pipe

L4

Heat rejection

Dry coolers and chillers sized for warm-water loops

L5

Controls

Monitoring, metering and remote operations

L6

Commissioning

Load banks, flush and fill, proven before shipment

Why modular

The fastest way to capacity is the one nobody objects to.

Sited without a fight

A smaller footprint, lower profile and quieter plant mean fewer objections from the neighbours and the planning board.

A lighter load on the grid

Warm-water cooling and staged, modular power mean less interconnection capacity requested and less time queued for it.

Capacity in months, not years

Factory build runs in parallel with site work, so the critical path is shorter from the first order to the first rack.

Grow in megawatt blocks

Start at the load you can fill today and add identical modules as demand arrives, instead of overbuilding on day one.

Sustainable by design

Containment, free cooling and closed liquid loops cut energy and water use without a premium on the equipment.

Proven before it ships

Every module is assembled, wired, piped and load-tested in the factory, with one party accountable through start-up.