The Palais approach
One system, engineered and tested as a whole.
Engineer it once, build and test it in a factory, and deliver it ready to connect. That shortens schedules, reduces work on site and makes the next phase a repeat of the last one.
Power
UPS, switchgear and batteries, integrated and tested
White space
Racks, containment, busway and cable trays
Liquid loop
CDUs, manifolds, cold plates and prefabricated pipe
Heat rejection
Dry coolers and chillers sized for warm-water loops
Controls
Monitoring, metering and remote operations
Commissioning
Load banks, flush and fill, proven before shipment
Why modular
The fastest way to capacity is the one nobody objects to.
Sited without a fight
A smaller footprint, lower profile and quieter plant mean fewer objections from the neighbours and the planning board.
A lighter load on the grid
Warm-water cooling and staged, modular power mean less interconnection capacity requested and less time queued for it.
Capacity in months, not years
Factory build runs in parallel with site work, so the critical path is shorter from the first order to the first rack.
Grow in megawatt blocks
Start at the load you can fill today and add identical modules as demand arrives, instead of overbuilding on day one.
Sustainable by design
Containment, free cooling and closed liquid loops cut energy and water use without a premium on the equipment.
Proven before it ships
Every module is assembled, wired, piped and load-tested in the factory, with one party accountable through start-up.